翻訳と辞書
Words near each other
・ Pewelka
・ Pewet Island
・ Pewett
・ Pewex
・ Pewhairangi
・ Pewit Island
・ Pewit Island (Portsmouth Harbour)
・ Pewits Nest State Natural Area
・ Pewitt Consolidated Independent School District
・ Pewitt High School
・ Pewley Hill
・ Pewou Bestman
・ PewPew
・ Pewsey
・ Pewsey Downs
Pewsey railway station
・ Pewsey Vale
・ Pewsey Vale F.C.
・ Pewsey Vale School
・ Pewsey White Horse
・ Pewsham
・ Pewsum
・ Pewter
・ PEX (disambiguation)
・ PEX1
・ PEX10
・ PEX11A
・ PEX11B
・ PEX11G
・ PEX12


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Pewsey railway station : ウィキペディア英語版
Pewsey railway station

Pewsey railway station is a railway station in the village of Pewsey in the county of Wiltshire in England. The station is on the Berks and Hants line, served by intercity trains operated by Great Western Railway between London and the West Country. The average journey time to London Paddington from Pewsey is just over an hour. Services between Pewsey and Bedwyn, the next station up the line, are infrequent, most eastbound services next calling at Hungerford, Newbury or Reading instead. This is a hangover from when Bedwyn was the most westerly point of the Network Southeast on this line, while Pewsey was an Intercity station.
Pewsey station (despite its relatively few services) has decent passenger usage due to its proximity to Marlborough, about away, and other nearby towns and villages with no railway station.
==History==
The station was opened by the Berks and Hants Extension Railway on 11 November 1862 when the railway opened, connecting the earlier Berks and Hants Railway with the branch of the Wilts, Somerset and Weymouth Railway, thereby creating a shorter route from London Paddington station to . On 2 July 1906 the line became part of the Reading to Taunton line following the opening of the Castle Cary Cut-Off.
The railway was operated from the start by the Great Western Railway and had been built using its broad gauge, but in 1874 it was converted to standard gauge. Initially it was just a single track with a platform on the south side. A passing loop and second platform was installed at Pewsey after a couple of years, and the line was converted to double track in 1899 in preparation for the opening of the Stert and Westbury Railway at . A signal box was situated on the west end of the eastbound platform; it was replaced by a larger signal box in 1933 but this was closed in 1966.〔
In 1969, the footbridge was replaced with a secondhand one brought from . By 2015 this bridge was in poor condition and was itself replaced by Network Rail with a new, taller, structure incorporating a rainwater drainage system and costing £465,000. In 1984 the old wooden waiting room on the eastbound platform was demolished and replaced by a brick-built shelter. This was built to match the distinctive Berks and Hants style of the original station buildings which still stand on the opposite platform. The following year the station was awarded a First Class award in the Best Preserved Station competition of the Association of Railway Preservation Societies.〔
The station celebrated its 145th birthday on 9 November 2007. A cake was cut by Pewsey Parish Council chairman, Alex Carder, with First Great Western service delivery manager Alison Stone.

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Pewsey railway station」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.